Latest News: Long Reach Telescopic Leader Rig Spec Sheet

June 18th, 2018

Long Reach Telescopic Leader Rig Spec Sheet

Sheet Piling (UK) Ltd are pleased to launch the world’s first Long Reach Telescopic Leader Rig.

 

The rig is aimed specifically at infrastructure projects where significant cost and programme benefits can be realised by utilising the unique technical and practical advantages to this method of sheet pile installation.

Such advantages over traditional methods include:

  • Maximum reach of 8.1m from centreline of base machine to pile line.
  • Provides an additional 3.0m of horizontal reach for sheet pile installation.
  • Reduces enabling works when installing sheet piles within existing cutting or embankment earthworks.
Long Reach Telescopic Leader Rig Embankment Works
Long Reach Telescopic Leader Rig Cutting Works

 

For any technical queries regarding the new rig, please contact us on: +44 (0)1772 79 41 41 or enquiries@sheetpilinguk.com.

Click here to see a video explaining the benefits of the new Long Reach rig.

Download the Long Reach Telescopic Leader Rig Specification Sheet here.

- Ends -

NOTES TO EDITORS
Sheet Piling (UK) Limited is one of the UK's leading piling contractors. Owning and operating a comprehensive range of specialist piling equipment Sheet Piling (UK) Ltd also carry extensive stocks of new and used piles enabling rapid reaction to any urgent requirements or emergency situations.