Sheet Pile Cofferdams

Sheet pile cofferdams are a specific form of a temporary works solution and as such is a cornerstone to the range of services offered by Sheet Piling (UK) Ltd.

The main purpose of a cofferdam is to exclude soil and/or water to form a safely supported excavation where construction works can progress. Generally speaking, cofferdams are constructed where significant excavation depths are required in otherwise poor or restricted working environments.

Cofferdams are formed using steel sheet piles acting either in cantilever or being supported by internal steelwork bracing frames or external anchorages. The exact design solution will be dependent on a number of factors including depth of excavation, external design forces, construction methodology and installation methodology.

Other than the benefits noted above, sheet pile cofferdams are extremely sustainable and environmentally beneficial forms of temporary works structures, as upon completion of the permanent structure, the temporary cofferdam can be fully extracted and re-used on another temporary works project.

 

Sheet Piling (UK) Ltd have significant experience in the design of temporary sheet pile cofferdams and all designs are carried out by our in-house sheet piling design team in order to provide the client with the optimum design solution in respect of construction methodology and interfaces between the temporary and permanent works. All design works are carried out using our ISO 9001 procedure and BS5975 Temporary Works procedures.

Cofferdams are primarily used for the construction of bridge foundations, underground storage tanks, drive and reception pits, land outfall structures, utility diversion schemes, and generally any deep excavation on land, or over water, where safe access to undertake construction works is required.

Sheet Piling (UK) Ltd has in excess of 4000Te of ‘U’ and ‘Z’ section steel sheet piles which are utilised on temporary cofferdam projects throughout the UK.

We are able to offer a complete design, supply, installation and removal service for any project requiring a temporary sheet pile cofferdam, along with any temporary steelwork bracing frames. Since all the elements required to deliver such a scheme are available under ‘one roof’, clients can be assured the ideal design solution will always be delivered in a timely and efficient manner.